Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
EYAYEN
Floor Cord Cover for Wires on Floor Self Adhesive Cord Hider Floor Cable Management Wire Covers for Cords Protector Prevent Cable Trips Cord Cavity W 0.47" x H 0.27", Gray Wood, 20Ft
Floor Cord Cover for Wires on Floor Self Adhesive Cord Hider Floor Cable Management Wire Covers for Cords Protector Prevent Cable Trips Cord Cavity W 0.47" x H 0.27", Gray Wood, 20Ft
Couldn't load pickup availability
Overview
- Brand : EYAYEN
- Color : Gray Wood
- Material : Wood
- Style : Modern
- Product Dimensions : 0.47"L x 0.47"W
About this item
- High Quality: Our cord cover floor is made from high-quality materials for excellent wear resistance and longevity. Its soft yet sturdy structure allows easy customization and trimming to accommodate any desired length, meeting various wiring needs.
- Reasonable Design: The curved surface and height of the floor cable cover ensure they are not easily tripped over when walking. The high-end smooth wood grain or pure color design adds aesthetic appeal to your space while seamlessly blending into various decorative styles.
- Easy Installation: Simplify your installation process with our cable hider floor equipped with a powerful adhesive backing. Simply place the wire in the channel, peel off the tape and stick the cable hider onto the desired surface for reliable and long-lasting adhesion, saving you time and effort.
- Versatile Applications: Perfect for hiding and protecting wires, cables, and other equipment in homes, offices, workshops, etc., our wall cord cover provides a neat appearance in scenarios such as connecting TV cables behind entertainment centers or computer cables under desks while preventing tripping accidents.
- Providing Protection: Prioritizing safety and functionality, we offer outstanding solutions for wire management and protection that effectively prevent damage caused by pedestrians, pets, or accidental pulling on wires while creating a safe and tidy environment.
Share

Blog Posts
View all-
5 Pack Aluminum Wall or Door Name Plate Holder ...
The SINYUDUN aluminum wall or door name plate holder provides a sleek and professional signage solution for offices and business spaces.Crafted from durable aluminum, this matte black name plate holder...
5 Pack Aluminum Wall or Door Name Plate Holder ...
The SINYUDUN aluminum wall or door name plate holder provides a sleek and professional signage solution for offices and business spaces.Crafted from durable aluminum, this matte black name plate holder...
-
Personalized Desk Name Plate with Golden Stars:...
This personalized desk name plate is a stylish and meaningful addition to any office or classroom decor.Designed with elegant golden stars, it adds a professional yet warm touch to desks...
Personalized Desk Name Plate with Golden Stars:...
This personalized desk name plate is a stylish and meaningful addition to any office or classroom decor.Designed with elegant golden stars, it adds a professional yet warm touch to desks...
-
SINYUDUN Aluminum Wall or Door Name Plate Holde...
The SINYUDUN aluminum wall or door name plate holder offers a clean and professional solution for office signage.Made from durable aluminum, these holders feature a sleek silver finish that fits...
SINYUDUN Aluminum Wall or Door Name Plate Holde...
The SINYUDUN aluminum wall or door name plate holder offers a clean and professional solution for office signage.Made from durable aluminum, these holders feature a sleek silver finish that fits...